cost
|
LDR | 00133cx j2200061 4500 | |
---|---|---|
001 | 87091 | |
100 | $a 20220428arumy03 ba0 | |
152 | $a AACR $b UTCB | |
250 | $7 ba0yba0a $8 rumrum $a cost |
Lucrări:
1 lucrari in 5 publicatii in 1 limbi
5 records Page 1 of 1
- 1
Comparison of Two Corporate Constructability Programs
de:
Russell, J.S.; Gugel, J.G.
(Text tipărit)
Seismic Retrofitting of Bridges by Response Modification Techniques Based on Altering Bearing Fixities
de:
Dicleli, Murat; Hindi, Riyadh
(Text tipărit)
Time-Dependent Bridge Network Reliability : Novel Approach
de:
Liu, Ming; Frangopol, Dan M.
(Text tipărit)
Remediation of RDX-Contaminated Water Using Alkaline Hydrolysis
de:
Hwang, Sangchul; Bouwer, Edward J.; Davis, Jeffrey L.; Larson, Steven L.; Brooks, Michael C.; Felt, Deborah R.
(Text tipărit)
Equipment Management through Operational Failure Costs
de:
Tsimberdonis, A.I.; Murphre Jr., E.L.
(Text tipărit)
Subiecte